USE CASE
Suitable for construction utility trenching and urban infrastructure work across project sites, road edges, smart-city corridors, and underground utility zones.

Self Propelled Multi Utility Machine | Equipment
Self-Propelled
Diesel
25 HP (18.8 kW)
Hydraulic Transmission
400 kg
30 L
Electric
Rudra Prime Mini is configured for construction utility trenching and urban infrastructure work where controlled output and reliable site performance are essential.
Rudra Prime Mini helps teams working across project sites, road edges, smart-city corridors, and underground utility zones improve clean utility trenches, predictable production, and smoother site coordination.
APPLICATION FIT
Suitable for construction utility trenching and urban infrastructure work across project sites, road edges, smart-city corridors, and underground utility zones.
Supports high route productivity for Construction rollout programs.
Helps maintain clean utility trenches, predictable production, and smoother site coordination for quicker installation and restoration.
Walk Behind Trencher is used for construction utility trenching and urban infrastructure work where route consistency and execution speed directly impact rollout schedules.
Teams deploy Rudra Prime Mini across project sites, road edges, smart-city corridors, and underground utility zones with planning around utility drawings, site access, trench dimensions, traffic constraints, and reinstatement plans.
The machine helps maintain cleaner worksite output for utility laying, inspection, backfill, and civil finishing teams.
PROJECT EXECUTION
Construction
Walk Behind Trencher is used for construction utility trenching and urban infrastructure work where route consistency and execution speed directly impact rollout schedules.
Teams deploy it across project sites, road edges, smart-city corridors, and underground utility zones with planning around utility drawings, site access, trench dimensions, traffic constraints, and reinstatement plans.
The machine helps maintain cleaner worksite output for utility laying, inspection, backfill, and civil finishing teams.


Construction
Maintain consistent trench depth and alignment to reduce rework during construction utility trenching and urban infrastructure work and site reinstatement.
Plan route productivity based on utility drawings, site access, trench dimensions, traffic constraints, and reinstatement plans.
Use predictable trench output to improve handoff quality between utility laying, inspection, backfill, and civil finishing teams.
WORKFLOW
Map route requirements, trench depth, and site access before deploying Rudra Prime Mini.
Use the attachment setup to keep trench output consistent across project sites, road edges, smart-city corridors, and underground utility zones.
Cleaner trench profiles help utility laying, inspection, backfill, and civil finishing teams proceed with less rework.
Autocracy Machinery can help match machine configuration, brochure details, and application guidance to the project.
APPLICATION SUPPORT
Share your site conditions, output goals, and timeline so the Autocracy team can guide model fit, brochure details, and next steps for your project.
Built for performance. Trusted by contractors, municipalities, and EPC teams across sectors.
| Feature | Value |
|---|---|
| Model | 800 |
| Net Power | 18.8 kW |
| Working Pressure | 18 MPa |
| Travel Speed | 3 km/h |
| Working System Flow Rate | 62.4 L/min |
| Gross Weight | 1200 kgs |
| Overall Length (with GP Bucket) | 2700 mm |
| Overall Width | 980 mm |
| Overall Operating Height | 3050 mm |
| Overall Length (without Bucket) | 2100 mm |
| Wheelbase | 1180 mm |
Common questions about using Rudra Prime Mini in this application.
Rudra Prime Mini supports construction utility trenching and urban infrastructure work where consistent output, route control, and field productivity matter.
It is suited for work across project sites, road edges, smart-city corridors, and underground utility zones, especially where teams need clean utility trenches, predictable production, and smoother site coordination.
Share utility drawings, site access, trench dimensions, traffic constraints, and reinstatement plans with Autocracy Machinery so the team can guide model fit, brochure details, and next steps.
Plan the work sequence from setup through utility laying, inspection, backfill, and civil finishing teams, including site access, output targets, and support requirements.
Yes. Consistent trench output helps downstream teams handle installation, inspection, backfill, and restoration work with fewer corrections.
Project, operations, and site teams should confirm route access, output goals, trench dimensions, and support needs before deployment.